Independent Sub-Contractor - MEPF
TH Mall · 2022 — 2024
Oversaw the design and installation of MEPF services for a commercial mall project. Managed the supply and installation of equipment including elevators and escalators. Compiled work schedules and progress reports. Examined shop drawings and project specifications for consultant approval during inspections. Participated in meetings with the mall owner for project updates. Assembled necessary documentation and permits for the completion of MEPF installation.
Project Manager (M & E)
BF Corporation · 2019 — 2022
Directed the design and execution of construction works for the common station, including MEPF systems and lift systems. Supervised site engineers to ensure adherence to project requirements. Produced week-by-week progress reports and work schedules. Reviewed project specifications and shop drawings for consultant approval. Engaged in coordination and progress meetings with the Department of Transportation.
Deputy Project Manager (M & E)
Muhibbah Engineering Philippines Corporation · 2016 — 2019
Managed construction and supervision of MEPF services for MRT-7 train stations. Supported the project manager in implementation and quality assurance processes. Assigned site engineers to specific areas of responsibility. Generated weekly progress reports and schedules. Evaluated design drawings and project requirements to meet client standards. Attended client meetings with San Miguel Corporation and contractors.
Project Manager – Mechanical (HVAC)
FR Sevilla Industrial and Development Corp. · 2016 — 2016
Conducted construction management for the Tutuban Center Mall project. Supervised site engineers while maintaining oversight of project execution. Compiled weekly progress reports and work schedules. Reviewed project specifications and shop drawings for consultant inspections. Participated in meetings with Ayala Land Corp. and ensured compliance with maintenance standards.
Senior HVAC Mechanical Engineer
SENEX SARL · 2016 — 2016
Supervised mechanical and HVAC installations for the New Doraleh Port Project. Engaged in client meetings to discuss work progress and ensure material compliance with specifications. Reviewed material submissions and shop drawings. Conducted testing and commissioning of MPF equipment for client handover.
Senior Testing and Commissioning Engineer
TUV RHEINLAND PHILIPPINES · 2015 — 2015
Implemented testing and commissioning protocols for systems including HVAC, fire protection, plumbing, refrigeration, and lift systems during all project phases. Compiled documentation on system performance and commissioning outcomes. Ensured installations complied with project specifications, shop drawings, and safety regulations.
Senior Testing and Commissioning Engineer
FORSSPAC AEIGHT PACIFIC CORPORATION · 2013 — 2014
Executed building testing and commissioning methods for the City of Dreams Resort Hotel and Casino project. Oversaw the implementation of HVAC, fire protection, and refrigeration systems among others. Managed equipment performance evaluations and functional testing, ensuring compliance with design criteria and safety standards.
Facilities Maintenance Mechanical Engineer
AKTOR (ADCC – JV) · 2013 — 2013
Oversaw mechanical facility maintenance and repairs within the New Doha Airport Hangar project. Administered preventive maintenance schedules and addressed corrective maintenance issues. Ensured all maintenance adhered to operational and maintenance manuals. Supervised skilled personnel in their duties.
Deputy Construction Manager – MEPF
ANEL GROUP (Anelmek) · 2011 — 2013
Assisted in construction management for MEPF works at the New Doha International Airport. Coordinated supervision of site engineers focusing on HVAC, plumbing, and fire protection tasks. Compiled weekly progress reports and monitored project specifications for consultant approval.
Senior Mechanical Engineer
ENERMES ENGINEERING QATAR · 2011 — 2011
Reviewed drawings and conducted material take-offs for mechanical projects at Pearl Qatar. Provided orientation and instruction to site engineers on project execution. Attended meetings with clients to address project-related matters.
Senior Mechanical Engineer
TECHNICAL RESOURCES COMPANY · 2010 — 2011
Performed drawing reviews and material evaluations for the Qatar Museum for Modern Arts. Guided site engineers on project tasks and participated in client coordination meetings while addressing project challenges.
HVAC-Refrigeration Engineer/Site Supervision
GULF ENGINEERING & INDUSTRIAL CONSULTANCY · 2008 — 2010
Provided site supervision and consultancy for the mechanical and HVAC/refrigeration works on projects such as Golden Bay Towers. Engaged in meetings with clients and contractors, ensuring adherence to project specifications and codes. Reviewed material submissions and supported commissioning processes for mechanical equipment.
Site Project Manager – Mechanical (HVAC)
SSF ENGINEERING PTE LTD. · 2006 — 2008
Managed overall operations for the Al Ezzel Combined Cycle Power Plant project in Bahrain. Supervised HVAC installations and conducted regular meetings with the engineering team. Acted as a liaison with clients to update them on project progress and prepared documentation for commissioning.
Project Manager
COOLFRONT AIR-CONDITIONING COMPANY · 1995 — 2006
Managed projects involving installation, maintenance, and repair of various air-conditioning systems. Oversaw centralized and split air-conditioning setups, including fire alarm systems and generators for office and commercial buildings.
Service Supervisor
AIR-CONDITIONING AND REFRIGERATION TECHNOLOGIES CORP. (Airetech) · 1993 — 1995
Assisted the Service Manager and oversaw technicians in their daily tasks. Evaluated technician performance, supervised documentation, and maintained service records. Coordinated with clerks on estimates and ensured quality assurance in customer interactions.
Department Head of Engineering
HOTEL SWISS MANILA · 1991 — 1993
Managed mechanical and electrical facilities at the hotel, overseeing maintenance services and repairs. Implemented preventive maintenance schedules to minimize corrective work. Collaborated with management on future planning for equipment maintenance improvement.
Central Air-conditioning Engineer
Ministry of Defense and Aviation – Air Defense Base Maintenance · 1985 — 1991
Handled maintenance, repair, and installation of central air-conditioning units across various air defense force bases in Riyadh. Monitored cooling for warehouses where sensitive materials were stored. Assisted in broader operational and maintenance functions.
Air-conditioning Plant Engineer
CONSOLIDATED BUILDING MAINTENANCE · 1983 — 1985
Oversaw the operation of an air-conditioning chiller system, managing cooling towers, pumps, and air-handling units. Responsible for maintaining large chiller units including associated systems. Assisted in additional engineering operations within the maintenance department.
Rail Track Maintenance – Tutuban to Bicol Line (Mechanized)
PHILIPPINE NATIONAL RAILWAYS (PNR) · 1978 — 1983
Maintained and aligned railway tracks using a tamping machine along the Tutuban Central Station to Bicol line.