34 viewsTalent
Romeo M. — Mid-Level Mechanical Foreman from Australia

Romeo M.

Mid-Level Mechanical Foreman

Australia No experience yet
Open to offersNew to Platform
Languages
English
Video Introduction
No video introduction yet
The candidate has not added a video.
Contact information and social networks are private. Connect to unlock.
Hidden

Portfolios

9 items
Sign in as an employer to view portfolio files

About

Romeo C. M. is an experienced Mechanical Foreman with a career spanning over two decades in the industrial and power plant sectors. His expertise is rooted in roles such as Millwright and Ironworker Foreman, significantly involved in substantial projects across the United Arab Emirates, Kuwait, Saudi Arabia, and Taiwan. At ITS, working on the ADNOC Refining Crude Flexibility Project, he skillfully handled the installation and alignment of equipment. In the Barakah Nuclear Power Plant project with DAESUN E&C, Romeo led the scheduling, supervision, and execution of complex installations and alignments of industrial equipment. His tenure at Al Hasoun Sejong Company further exemplified his strength in project execution, overseeing torque tightening and support foundation layouts. Romeo also boasts notable contributions to GS I & C and AL GHAMDI COMPANY, where his responsibilities spanned equipment alignment, installation of oil purification units, and alignment of auxiliary pumps. With a foundation in Automotive Mechanics, Romeo consistently demonstrates practical proficiency, making him an asset within industrial operations.

Experience

  • Millwright Foreman

    ITS (Industrial Technology Services) · 2020 — 2020
    Installed and assembled plates for downcomer trays. Modified the auxiliary pipeline of the vessel. Conducted alignment of pumps and motors. Altered the step inner of the tray support. Oversaw the erection of all equipment. Executed alignment for skid and pump motors.
  • Iron Worker Foreman

    DAESUN E&C COMPANY · 2017 — 2019
    Reported project progress to superiors and developed work schedules for crew members. Supervised construction workers and assigned tasks. Marked foundation locations for IPB and managed the hauling, loading, and unloading of materials and equipment. Oversaw installation and erection of materials, equipment, and supports, including IPB generators and neutral boxes. Executed grinding and cleaning tasks in welding areas.
  • Millwright

    AL HASOUN SEJONG COMPANY · 2015 — 2017
    Performed layout for support foundations of IPB and NSPB. Fabricated support structures and assembled them on foundations. Prepared lifting devices for the erection of IPB and NSPB, ensuring proper torque tightening of bolts and nuts. Conducted touch-up painting, grinding, and cleaning of damaged areas. Managed the installation of auxiliary parts of equipment.
  • Millwright

    GS I & C COMPANY · 2013 — 2015
    Oversaw erection and installation of all equipment, motors, and pumps. Assembled and erected the boiler along with other components. Inspected for missing parts and installed them as necessary. Executed installation of HDPE pipelines and managed the erection of water purification units 1 and 2.
  • Millwright/Millwright Foreman

    AL HASOUN SEJONG COMPANY · 2006 — 2012
    Handled receipt and positioning of generator turbines on foundations. Aligned generators with turbines and performed foundation layout and leveling using transit or auto levels. Removed transport covers and installed stator casings and top covers. Installed bearing pedestals and flushed jacking oil systems of steam turbines and generator pedestals. Conducted final alignments and installed generator accessories.
  • Millwright Technician

    AL GHAMDI COMPANY · 2003 — 2004
    Checked alignment for auxiliary pumps and replaced damaged rubber bushings. Aligned turning gear oil pumps and inspected vibration levels. Managed lubrication and cleaning of AC and DC jacking oil pumps and performance of lube oil transfer pumps. Conducted maintenance on oil purifiers and engaged in pre-shutdown activities by monitoring operational parameters.
  • Mechanical Technician

    FORMOSA CHEMICAL AND FIBER CORPORATION (FCFC) · 1999 — 2000
    Assisted vendors with inspections of trays inside vessels and supported assembly and disassembly of centrifugal pumps. Executed alignment checks of pin fan coolers and ensured installation of fasteners. Monitored vibration levels of rotating equipment and preserved all pumps while conducting overhauls and oil changes.
  • Millwright

    DAELIM CONSTRUCTION COMPANY · 1998 — 1999
    Executed erection and installation of gas compressors, vessels, pumps, and reactor components. Mounted and leveled sole plates, ensuring proper alignment for anchoring. Conducted preliminary alignments and completed final alignments, including hot alignment prior to commissioning.

Skills & Expertise

Education

  • Vocational course in Automotive Mechanic
    Rizal Technological Polytechnic Institute · 1987 — 1989
  • Secondary
    Sierra Madre Institute · 1982 — 1986
  • Primary
    Patricio Jarin Memorial School · 1976 — 1982

Interested in this professional?

Sign in as an employer to save this profile or invite Romeo M. to a job.

Sign in as an employer